STARLIGHT convinces on the construction site

Jan 21, 2022

During the necessary rehabilitation of an entire pipe line in Sankt Augustin, one pipe was used as a demonstration of our STARLIGHT UV system during the installation of 3 liners at the end of December. The DN 300 pipe was rehabilitated with a GRP liner from Brandenburger with a wall thickness of 4.2 mm.

Under the leadership of site manager Rainer Schuster of the company Kuchem, the rehabilitation of the road was carried out with the support of the companies Brandenburger and Kanaltechnik Schuster. Quickly and without any complications, the sewer was rehabilitated with our STARLIGHT UV system and the 4 x 400 W chain. The leak test carried out directly after the installation was successfully passed and the attitude was thus completed.

During a subsequent discussion, the further application possibilities of the flexible STARLIGHT with smaller heads were explained. Thank you very much for the opportunity to show our STARLIGHT in practice and to explain the various possible applications.

You are also interested in a free demonstration and would like to get to know the various application possibilities? Then please contact our sales team and arrange an appointment.